Conceptual Engineering for ABC Single Use Suite for biologics
Case 10: Abbott Bioresearch Centre Conceptual Engineering for ABC Single Use Suite for biologics Problem Statement To undertake complete conceptual design for the ABC Single Use Suite for biologics at Abbott’s Bioresearch centre at Worcester, …
CASE STUDY
2
Design-Build for a Class 1 Div 2 Suite
Case 2: Teva Pharmaceuticals Situation: The client was developing a sterile API that classified as an OEL 4 potent compound using solvents. This would warrant a manufacturing suite, which was clean and capable of handling solvents as well …
CASE STUDY
3
RO WATER SYSTEM OPTIMIZATION AND HYDRAULIC MODELLING USING FATHOM
Case 3: Genzyme Corporation Situation: The Genzyme Allston Landing Facility (ALF) is a bulk biologics manufacturing facility located in Allston, MA. Historically, low level excursions were observed for the existing RO and WFI storage tanks …
CASE STUDY
4
REDLINING AND UPDATING P&IDS
Case 4: Chemtura Corporation (Hatco Division) Situation: The client is a unique producer of specialty chemicals located at a 75 acre site in New Jersey. Panorama’s client was the purchaser of the facility and realized that most of the P&IDs …
CASE STUDY
5
CIP Time Optimization
Case 5: CIP Time Optimization for a facility for Bristol Myers Squibb Situation: Current CIP time for cleaning a reactor system at a BMS site was 12-13 hours. This long cleaning time, was a major concern for the client because this substantially …
CASE STUDY
6
Design-Build Project in an existing facility
Case 6: Genzyme Corporation - Design Built Project Situation: A pharmaceutical major based out of USA has a running facility located in Framingham, MA. Client wanted to build a suite for Part washer and Glass washer in this running facility …
CASE STUDY
7
Process Changes to solve corrosion issues
Case 7: P&G / The Gillette Company Situation: The existing process water system located in P&G/Gillette Powerhouse exchanges process (cooling) water with sea water from four point channel in order to provide cooling water for various …
CASE STUDY
8
Distillation column train simulation and optimization
Case 8: Chemicals manufacturing facility at Vapi Gujarat Simulation of continuous distillation columns Situation: A chemicals manufacturing company was in the phase of modernising its 25 year old plant. The current train of distillation columns …
CASE STUDY
9
Solvent dispensing and waste collection system
Case 9: Vertex Pharmaceuticals Situation: The client had a multi-story building with retail space on ground level and research labs on 2nd, 3rd and 4th levels. The client wanted to set-up a central solvent dispensing system to supply five …
CASE STUDY
10
Basic Engineering Package Design
Case 1: Alkyl Amines Chemicals Limited Plant design for production of Y TPD of product X* Problem Statement To design a plant for Y tons per day of production of product X for Alkyl Amines Chemicals Ltd. Approach The project involved the …